Resume of
Michael K. Tippit
PERSONAL DATA
Address:
1730 Lightsey Rd.., St.
Augustine, FL 32084
Phone No.:
(904)
599-0050
Fax No.:
(480)
287-8117
EDUCATION
BA Degree – Major: Business Administration, Minor: Accounting,
Saint Leo University, St. Leo, FL, 2008
AS Degree – Major: Business Administration, St. Johns River
Community College, St. Augustine, FL, 2005
University of
Phoenix, Online Campus, Phoenix, AZ - Management courses,
1998
Foley-Belsaw
Institute - PC Repair Specialist
Diploma, 1998
Foley-Belsaw
Institute - LAN/Networking Specialist
Diploma, 1998
AA Degree – Major: Computer and Information Systems, St. Johns
River Community College, St. Augustine, FL, 1993
Hillsborough
Community College, Brandon Campus, Tampa, FL, 1991
Okaloosa - Walton
Community College, Niceville, FL, 1988 – 1990
ASSOCIATIONS
Delta Sigma Epsilon
– Miami, FL
Phi Theta Kappa -
Alpha Xi Eta Chapter, St. Augustine, FL
National Notary
Association / American Association of Notaries Public / American Society of
Notaries
ASHE – Northeast FL
Chapter
LICENSES
FL Real Estate
Sales Agent - # SL3188662
FL Notary Public & NNA
Certified/Background Screened Signing Agent - Commission # DD888241
CERTIFICATIONS
American Concrete
Institute - Concrete Field Testing Technician - Grade 1
American Concrete
Institute – Concrete Transportation Construction Inspector (Level
2)
American Segmental
Bridge Institute – Grouting Testing Training
SSPC – Level 1
Bridge Coatings Inspector
Post-Tensioning
Institute – Level 1Bonded Tendon Inspection
C.P.N. - Radiation
Safety and Use of Nuclear Density Soil Gauges
Troxler Radiation
Safety Officer
FL Dept. of
Environmental Protection – Stormwater Management Inspector #
4339
American Traffic
Safety Services Association – FL Advanced Worksite Traffic Safety
Supervisor
NICET – Level
2
CTQP Qualifications-
/ Florida Department of Transportation
Certificates
|
Pre-stressed Concrete
Inspection |
CTQP - Asphalt Paving Technician - Level I
& II |
Concrete Bridge & Foundation
Inspection |
CTQP – Qualified Grouting Technician –
Level I & II |
Basic, Intermediate and Advanced Multiline
Earthwork |
CTQP – Pile Driving
Inspection |
Asphalt Inspection
Reporting |
CTQP – Drilled Shaft
Inspection |
Earthwork Density Record
System |
CTQP – QC Manager |
Contract Administration & Claims
Analysis |
CTQP – Final Estimates – Level I &
II |
Utility Relocation, Clearing &
Grubbing, and Miscellaneous Concrete Structure
Inspection |
CTQP – Concrete Field Technician – Level I
& II |
Pipe Placement
Inspection |
CTQP – Earthwork Construction Inspection –
Level I |
Construction Math & Contract Plan
Reading |
CTQP – Qualified Post-Tensioning
Technician – Level I |
Project Engineer
Training |
MAJOR PROFESSIONAL EXPERIENCE
10/11 – Present Sr. Inspector – Eisman & Russo Engineers,
Jacksonville, FL
San Sebastian Bridge replacement, St. Augustine, FL
Duties include the
supervision and coordination of project inspection personnel, daily oversight of
the Contractor's manpower, equipment and operations, verify compliance with
plans and specifications for FDoT. Review CPM schedules, provide progress
reports to management, QC review of Administrative operations and assist in the
preparation of the Final Estimate.
12/01 – 10/11
Project Administrator / Office Engineer / Sr. Inspector –
Parsons Brinckerhoff Inc., Jacksonville, FL
SR200 (A1A)
& Chester Rd. Intersection Improvements, Yulee, FL; SR200 Widening project
(Design/Build) – Callahan, FL; I-295 Milling and Resurface projects, J. Turner
Butler Milling and Resurface projects, Jacksonville, FL; SR 207 Widening
projects, Segments 6 & 7, St. Augustine, FL; and Fuller Warren Bridge
Replacement project, Jacksonville, FL
Duties include the
supervision and coordination of project inspection personnel, daily oversight of
the Contractor's manpower, equipment and operations, verify compliance with
plans and specifications for FDoT. Review CPM schedules, provide progress
reports to management, QC review of Administrative operations and supervise the
preparation of the Final Estimate. Worked as the Office
Engineer for the $110M+ Fuller Warren Bridge replacement project in
Jacksonville. Responsible for monthly Contractor progress estimates,
documentation and backup for the Final Estimate, and assist in the field
inspection duties when necessary.
Responsible for writing Supplemental Agreements and
Field Work Orders for any changes in work. I also worked on the Widening and
Reconstruction project of State Road 207 from St. Augustine to Hastings.
Performed several duties during the two years this project, including assisting
with the Monthly and Final Estimates, assisted the Project Administrator with
the daily supervision of the project progress, review of the Contractor's CPM
schedule and writing reports for management.
6/01 – 12/01
Office Engineer / Inspector -
Reynolds, Smith & Hills CS Inc., Plantation, FL
Phase IV
Double-track project – Miami, FL
Duties were to assist the Project Engineer in
the daily management and inspection of the Contractor's work force and CSXT's
work crews, compile reports for FDoT/SFRC and Tri-Rail. Responsible for
inputting test data into FDoT's CQR system, prepared the Contractor's Monthly
progress estimate, assisted field personnel with inspection duties, updated
quantities for the Final Estimate, reviewed CSXT's bills for FDoT and
recommended approval or denial of their costs.
3/01 - 6/01
Construction Inspector - Aviant Group / Missouri Dept. of
Transportation, St. Louis, MO
Page Avenue Extension Bridge project – St. Charles,
MO
Duties included the daily inspection and
documentation of the Contractor's manpower, equipment and operations, while
concurrently verifying compliance with plans and specifications for the Missouri
Dept. of Transportation. Responsible for keeping daily reports of progress both
in field books and input into the state's Site-Manager software, concrete
testing, acceptance and related concrete reports, breaking of field concrete
test samples, logging and verifying materials such as structural steel girders,
cross-braces, bolts and bearing pads, placement and alignment of steel girders,
field-checking torque of structural bolts and assisting with bi-weekly progress
estimates. Had to leave and come back to FL early due to family
concerns.
4/00 - 3/01
Office Engineer - Reynolds,
Smith & Hills CS Inc., Plantation, FL
SR16 Bridge Replacement / US 1 Resurfacing projects – St. Augustine,
FL
Duties were to assist the Senior Project
Engineer in the daily management and documentation of the Contractor's work
force and operations. Responsible for tracking the contractor's progress by use
of Microsoft Word, Excel, WordPerfect, Lotus, Primavera, SureTrak, Lynx Photo
Management, FDOT's PC-CRS and other FDOT Engineering software. Responsible for
compilation of the Engineer's Weekly Summary, inputting test data into the
FDoT's CQR system, preparing the Contractor's Monthly progress estimate,
Supplemental Agreements, Work Orders and the Final Estimate.
10/99 - 3/00
MIS Computer Specialist - Reynolds, Smith & Hills Inc.
(Corporate Office), Jacksonville, FL
Duties include setting up PC LAN Networks for CS
Field offices throughout the state of Florida, installing and configuring
software, maintaining inventories of software and hardware, providing field tech
services to all CS field offices, assisting the CS Operations Manager with
putting together proposals, audit packages and invoicing for CS services, and
general trouble-shooting for CS operations.
7/91 - 9/99
Project Engineer, Office Engineer, Senior
Inspector -Reynolds, Smith & Hills CS Inc., Plantation,
FL
Matanzas Inlet
Bridge Replacement, Vilano Bridge Replacement, SRA1A Widening and SR312 Bridge
projects – All projects in St. Augustine, FL
Duties were to assist the Senior Project
Engineer in the daily management, inspection and evaluation of the Contractor's
work force. Supervised the inspection team and assigned inspection duties.
Inspected and documented contractor's manpower, equipment and operations while
concurrently verifying compliance with plans and specifications. Verified
contractor's work, e.g., earthwork grades and densities, base, asphalt
placement, formwork of C.I.P. concrete structures, reinforcing steel placement,
drainage structures and pipe placement, highway lighting, signs and signals.
Tracked Contractor's progress against baseline CPM
schedule. Responsible for compilation of the Engineer's Weekly Summary,
preparing the Contractor's Monthly progress estimate and the Final Estimate.
Also handled the accounting responsibilities, including the
firm's monthly invoice to FDoT, the firm's Impress checking account, petty cash
account and office accounts payable.
7/90 - 6/91
Computer Specialist, Technical Services Representative -
Florida Mining & Materials Quality Control Laboratory, Riverview,
FL
Responsible for input,
analysis and maintenance of all data processing duties for the Q.C. lab, using
both a PC and a Digital VAX terminal.
Issue, input, and transfer to District computers, all product codes for mix
designs, concrete block, and resale items for the company. Duties include
compiling data and generating reports on monthly quality control of the 64
concrete and block plants throughout the state. Conceived, devised and
implemented plan to link District PC's via modems, allowing transmission of mix
designs and other data directly from P.C. to P.C., rather than by fax machine,
which cut down on the District's operations costs. Responsibilities also include
in-house technical services, answering mix design questions, formulating new mix
designs, resolving technical questions and/or problems, maintain all technical
materials, files, and product information in the central filing system.
9/89 - 7/90
Office Engineer / Inspector -
Reynolds, Smith & Hills CS Inc., Plantation, FL
US Hwy. 331 Bridge replacement project – Santa Rosa Beach,
FL
Duties were to assist the Project Resident
Engineer and Sr. Inspectors in the daily supervision, inspection and evaluation
of the Contractor's work force and to make daily reports for FDoT. Personally
responsible for M.O.T. reports, concrete testing and acceptance, breaking of
concrete test samples, CQR data entry and updating quantities for monthly
project estimate.
References available
upon request.